Conditions, irrigation and control history sit together. A breach is visible, and whether a pump or valve ran is on record. Yield is compared afterwards, not promised by a model.

Pain Points

  1. 01

    Temperature and humidity are known only on a visit

  2. 02

    Whether irrigation ran depends on memory

  3. 03

    A failed pump waits for the next walk-through

  4. 04

    Yield cannot be compared with the conditions at the time

How the system is put together

Keep the equipment you have, connect the data first, then split the views by role. The connection layer takes the most work, and it is where most of our effort goes.

L1

Devices

  • Greenhouse sensors
  • Fertigation
  • Weather station
  • Cameras
  • Cold storage

PLCs, meters, access control, cameras and sensors already on site. Read what is readable, add a module where it is not, and leave the existing control system alone.

L2

Connection

Modbus · OPC UA · MQTT · HTTP · GB28181 · SDK

Common protocols connect directly. The gateway handles protocol mapping, local buffering and backfill, so the data does not break.

L3

Platform

  • Device registry
  • Time-series data
  • Alert rules
  • Work orders
  • Roles and audit

Device registry, time-series data, alert rules, work orders, roles and audit in one back end that serves several scenarios.

L4

Applications

  • Environment monitoring
  • Irrigation records
  • Device alerts
  • After-the-fact review
  • Manager view
  • Phone actions on site
  • Narrow external lookup

Data is collected once and reused by every scenario added later, which is why the connection layer has to be done properly the first time.

What we deliver

01

House conditions

Temperature, humidity and soil moisture by house, with a notice when a line is crossed.

02

Irrigation record

Pump and valve on-off times are stored.

03

Equipment alerts

Offline or abnormal status is pushed, not found on the next walk.

04

Compare later

Condition history stays so it can be read against the harvest.

Where it fits

  • Greenhouses
  • Livestock climate
  • Irrigation pumps
  • Farm duty

What a real day looks like

Not a feature list: what actually happens in a day. These four steps are the common shape of such projects.

  1. 06:00 High humidity

    Greenhouse humidity leaves the range for that growth stage, and the system suggests a venting duration.

  2. 06:20 Executed

    One tap sends it to the fans; the result comes back and only needs confirmation.

  3. Harvest

    The season’s temperature and humidity curves are compared against yield.

Delivery rhythm

Every stage has a checkable output. No six-month build followed by a single review.

  1. Week 1

    Site survey

    Walk the site, list devices, available ports and current systems, and mark what reads directly versus what needs a module.

  2. Week 2

    Pick the first scenario

    Rank the ideas by impact, feasibility and dependencies, then choose one that proves value without dragging in every department.

  3. Weeks 3-5

    Connect and wire up

    Gateways connect devices, data lands on the platform, and alert rules, roles and recipients are configured for a small internal group.

  4. Weeks 5-7

    Pilot

    One team or one building uses it for real; rules and screens change with feedback until false and missed alarms settle.

  5. Week 8

    Accept and repeat

    Check every acceptance item, finish documentation and training, then decide which buildings, lines or sites come next.

Acceptance is these three lines

The three items below come from projects of this kind and go into the acceptance sheet, instead of relying on a general impression.

  • task_alt

    A breach is visible without a visit

  • task_alt

    Irrigation on-off is recorded

  • task_alt

    Offline equipment does not wait for the next walk

Questions

Where does this industry get stuck?

Temperature and humidity are known only on a visit Whether irrigation ran depends on memory A failed pump waits for the next walk-through Yield cannot be compared with the conditions at the time

What does Yifu do here?

House conditions: Temperature, humidity and soil moisture by house, with a notice when a line is crossed. Irrigation record: Pump and valve on-off times are stored. Equipment alerts: Offline or abnormal status is pushed, not found on the next walk. Compare later: Condition history stays so it can be read against the harvest.

What changes after it is in place?

A breach is visible without a visit Irrigation on-off is recorded Offline equipment does not wait for the next walk

Do we have to replace our current systems?

No. The platform reads through interfaces or gateways and the existing systems stay in use. Only modules nobody maintains are worth replacing.

What does it cost, and how soon is it live?

Priced by scenarios and device connection points: a site survey produces the list, then a quote and schedule. Most projects have a first scenario live in four to eight weeks.

Free diagnosis

Tell us where it gets stuck

Leave one contact. We send how similar projects were handled plus a scenario list. If it is not worth doing, we say so.

  • checkA 30-minute call to judge whether it is worth doing
  • checkA workable scenario list and timeline
  • checkNo consulting fee up front

No spam, and we never share your details with third parties.

Get Industry-specific Solution

Phones are answered 9:00-18:00 on weekdays, or scan the WeChat code.