Connected machines
Status and alarms from lines and utilities land on one platform.
See line equipment, quality and downtime as they happen.
The plan is built around machine data: live status, a reason for every stop, batch traceability, and maintenance based on condition rather than the calendar alone.
Stops are explained only after someone walks the line
Output and defects wait for the end-of-shift report
A bad batch cannot be tied back to machine and material
Calendar maintenance misses real wear and stops healthy machines
Keep the equipment you have, connect the data first, then split the views by role. The connection layer takes the most work, and it is where most of our effort goes.
PLCs, meters, access control, cameras and sensors already on site. Read what is readable, add a module where it is not, and leave the existing control system alone.
Modbus · OPC UA · MQTT · HTTP · GB28181 · SDK
Common protocols connect directly. The gateway handles protocol mapping, local buffering and backfill, so the data does not break.
Device registry, time-series data, alert rules, work orders, roles and audit in one back end that serves several scenarios.
Data is collected once and reused by every scenario added later, which is why the connection layer has to be done properly the first time.
Status and alarms from lines and utilities land on one platform.
Output, cycle time and downtime show during the shift.
Batch, machine and process values stay linked for later lookup.
Vibration and temperature point to machines that need work.
Run, alarm and stop states carry a reason code, so downtime and the output gap are calculated rather than explained.
Station cycle time, WIP and defect types come up live, so the constraint is visible during the shift.
Air, water, power and steam split by workshop and line, with low pressure or odd consumption raised early.
Batch, machine, process values and material lot sit on one record, so a look-back takes a few steps.
Not a feature list: what actually happens in a day. These four steps are the common shape of such projects.
Line 3 spindle stops; the operator picks "tool change" on the tablet and the clock starts.
The stop is attached to the machine and reason code, and the output gap for that window is computed.
The team leader sees it on the shift board instead of learning at handover.
The same cause appears 11 times and ranks first, which changes the next maintenance plan.
Every stage has a checkable output. No six-month build followed by a single review.
Walk the site, list devices, available ports and current systems, and mark what reads directly versus what needs a module.
Rank the ideas by impact, feasibility and dependencies, then choose one that proves value without dragging in every department.
Gateways connect devices, data lands on the platform, and alert rules, roles and recipients are configured for a small internal group.
One team or one building uses it for real; rules and screens change with feedback until false and missed alarms settle.
Check every acceptance item, finish documentation and training, then decide which buildings, lines or sites come next.
The three items below come from projects of this kind and go into the acceptance sheet, instead of relying on a general impression.
Every stop has a time and a reason
Quality issues trace to machine and batch
Maintenance follows machine condition
Scattered plant devices and protocols, brought into one platform for inventory, boards and alerts—less ad-hoc ops handoff.
Device onboarding and inventory in one place
Learn More →ManufacturingDowntime was reported by hand and quality hard to trace; line boards, inspection hooks and planning views make the shift visible.
Shift output and downtime reasons visible
Learn More →IndustrialIndustrial real-time database for high-performance data acquisition, storage and analysis
High-frequency points land reliably
Learn More →Common brands go through OPC UA, Modbus or FOCAS; older machines get a gateway reading IO or current. The list of machines and available ports decides each case.
Read-only: no control commands are written back. The gateway buffers locally when the network drops and backfills afterwards.
Most wiring fits a planned window, typically one to two hours per machine. Machines that can stay running are wired live.
The platform owns machine data and causes, MES keeps orders and materials, ERP keeps the books. They align through interfaces, with no double entry.
One line first: a mid-shift board in four to six weeks, then other lines once the numbers hold up.
Leave one contact. We send how similar projects were handled plus a scenario list. If it is not worth doing, we say so.
Phones are answered 9:00-18:00 on weekdays, or scan the WeChat code.