Machine location
Key machines show their current project, and transfers are recorded.
Site equipment, conditions and material movements on the project.
Three things: which site a machine is on, whether site conditions crossed a line, and whether materials were signed out. It does not replace the whole construction suite.
Crane and hoist locations are confirmed by phone
Dust and noise breaches arrive as a notice from outside
Material issues have no record at settlement
Maintenance notes stay on personal phones
Keep the equipment you have, connect the data first, then split the views by role. The connection layer takes the most work, and it is where most of our effort goes.
PLCs, meters, access control, cameras and sensors already on site. Read what is readable, add a module where it is not, and leave the existing control system alone.
Modbus · OPC UA · MQTT · HTTP · GB28181 · SDK
Common protocols connect directly. The gateway handles protocol mapping, local buffering and backfill, so the data does not break.
Device registry, time-series data, alert rules, work orders, roles and audit in one back end that serves several scenarios.
Data is collected once and reused by every scenario added later, which is why the connection layer has to be done properly the first time.
Key machines show their current project, and transfers are recorded.
Dust and noise notify the site when a line is crossed.
Issues name the project and the use, for later settlement.
Service records stay on the machine across projects.
Not a feature list: what actually happens in a day. These four steps are the common shape of such projects.
PM10 passes the limit, spray starts and the safety officer is notified.
The officer uploads a photo and the record enters the environmental log.
Exceedance windows export with the spray records for regulatory filing.
Every stage has a checkable output. No six-month build followed by a single review.
Walk the site, list devices, available ports and current systems, and mark what reads directly versus what needs a module.
Rank the ideas by impact, feasibility and dependencies, then choose one that proves value without dragging in every department.
Gateways connect devices, data lands on the platform, and alert rules, roles and recipients are configured for a small internal group.
One team or one building uses it for real; rules and screens change with feedback until false and missed alarms settle.
Check every acceptance item, finish documentation and training, then decide which buildings, lines or sites come next.
The three items below come from projects of this kind and go into the acceptance sheet, instead of relying on a general impression.
Machine location does not need a phone call
The site hears a condition breach first
Material issues match at settlement
Scattered plant devices and protocols, brought into one platform for inventory, boards and alerts—less ad-hoc ops handoff.
Device onboarding and inventory in one place
Learn More →IoTRemote device control and monitoring system
Command results can be acknowledged
Learn More →Crane and hoist locations are confirmed by phone Dust and noise breaches arrive as a notice from outside Material issues have no record at settlement Maintenance notes stay on personal phones
Machine location: Key machines show their current project, and transfers are recorded. Site conditions: Dust and noise notify the site when a line is crossed. Material trail: Issues name the project and the use, for later settlement. Maintenance on the asset: Service records stay on the machine across projects.
Machine location does not need a phone call The site hears a condition breach first Material issues match at settlement
No. The platform reads through interfaces or gateways and the existing systems stay in use. Only modules nobody maintains are worth replacing.
Priced by scenarios and device connection points: a site survey produces the list, then a quote and schedule. Most projects have a first scenario live in four to eight weeks.
Leave one contact. We send how similar projects were handled plus a scenario list. If it is not worth doing, we say so.