Footfall, public-area equipment and energy sit on one operations page, so a busy floor, a stopped machine and a high-use zone are compared on the same clock.

Pain Points

  1. 01

    Footfall arrives the next day from another vendor

  2. 02

    Engineering and operations each know half of a breakdown

  3. 03

    Energy is “the mall is high”, not where

  4. 04

    A campaign has no before-and-after footfall

How the system is put together

Keep the equipment you have, connect the data first, then split the views by role. The connection layer takes the most work, and it is where most of our effort goes.

L1

Devices

  • Central HVAC
  • Escalators
  • Lighting
  • Footfall
  • Parking

PLCs, meters, access control, cameras and sensors already on site. Read what is readable, add a module where it is not, and leave the existing control system alone.

L2

Connection

Modbus · OPC UA · MQTT · HTTP · GB28181 · SDK

Common protocols connect directly. The gateway handles protocol mapping, local buffering and backfill, so the data does not break.

L3

Platform

  • Device registry
  • Time-series data
  • Alert rules
  • Work orders
  • Roles and audit

Device registry, time-series data, alert rules, work orders, roles and audit in one back end that serves several scenarios.

L4

Applications

  • Footfall by zone
  • Device alerts
  • Energy by zone
  • Event comparison
  • Manager view
  • Phone actions on site
  • Narrow external lookup

Data is collected once and reused by every scenario added later, which is why the connection layer has to be done properly the first time.

What we deliver

01

Footfall by zone

Entrances and floors are visible the same day.

02

Public equipment

Escalator, HVAC and lighting alarms become jobs both teams can see.

03

Energy by zone

Power is split by floor or system, and high zones are listed.

04

Campaign compare

Footfall before and after an event uses the same count.

Where it fits

  • Shopping centres
  • Retail streets
  • Transit retail
  • Neighbourhood retail

What a real day looks like

Not a feature list: what actually happens in a day. These four steps are the common shape of such projects.

  1. 10:00 Before opening

    Cooling runs ahead of opening, and low-traffic floors start later.

  2. 15:20 Escalator noise

    An escalator on level 3 reports unusual noise; a ticket goes to the on-site crew.

  3. Same day

    The repair enters the equipment file, and the monthly report shows the fault spread.

Delivery rhythm

Every stage has a checkable output. No six-month build followed by a single review.

  1. Week 1

    Site survey

    Walk the site, list devices, available ports and current systems, and mark what reads directly versus what needs a module.

  2. Week 2

    Pick the first scenario

    Rank the ideas by impact, feasibility and dependencies, then choose one that proves value without dragging in every department.

  3. Weeks 3-5

    Connect and wire up

    Gateways connect devices, data lands on the platform, and alert rules, roles and recipients are configured for a small internal group.

  4. Weeks 5-7

    Pilot

    One team or one building uses it for real; rules and screens change with feedback until false and missed alarms settle.

  5. Week 8

    Accept and repeat

    Check every acceptance item, finish documentation and training, then decide which buildings, lines or sites come next.

Acceptance is these three lines

The three items below come from projects of this kind and go into the acceptance sheet, instead of relying on a general impression.

  • task_alt

    Same-day footfall by floor

  • task_alt

    Equipment alarms and jobs are one item

  • task_alt

    High-use zones are named

Questions

Where does this industry get stuck?

Footfall arrives the next day from another vendor Engineering and operations each know half of a breakdown Energy is “the mall is high”, not where A campaign has no before-and-after footfall

What does Yifu do here?

Footfall by zone: Entrances and floors are visible the same day. Public equipment: Escalator, HVAC and lighting alarms become jobs both teams can see. Energy by zone: Power is split by floor or system, and high zones are listed. Campaign compare: Footfall before and after an event uses the same count.

What changes after it is in place?

Same-day footfall by floor Equipment alarms and jobs are one item High-use zones are named

Do we have to replace our current systems?

No. The platform reads through interfaces or gateways and the existing systems stay in use. Only modules nobody maintains are worth replacing.

What does it cost, and how soon is it live?

Priced by scenarios and device connection points: a site survey produces the list, then a quote and schedule. Most projects have a first scenario live in four to eight weeks.

Free diagnosis

Tell us where it gets stuck

Leave one contact. We send how similar projects were handled plus a scenario list. If it is not worth doing, we say so.

  • checkA 30-minute call to judge whether it is worth doing
  • checkA workable scenario list and timeline
  • checkNo consulting fee up front

No spam, and we never share your details with third parties.

Get Industry-specific Solution

Phones are answered 9:00-18:00 on weekdays, or scan the WeChat code.