Asset board
The assets that must be watched together sit on one map.
Municipal assets and alarms on one board for the duty desk.
Existing systems stay. The duty desk gets one board for the status and alarms that need to be seen together, then handed on and reviewed.
Lights, covers, pumps and environment each have their own screen
An alarm has no clear department to receive it
Closed events leave no shared record
Management figures and the duty desk figures differ
Keep the equipment you have, connect the data first, then split the views by role. The connection layer takes the most work, and it is where most of our effort goes.
PLCs, meters, access control, cameras and sensors already on site. Read what is readable, add a module where it is not, and leave the existing control system alone.
Modbus · OPC UA · MQTT · HTTP · GB28181 · SDK
Common protocols connect directly. The gateway handles protocol mapping, local buffering and backfill, so the data does not break.
Device registry, time-series data, alert rules, work orders, roles and audit in one back end that serves several scenarios.
Data is collected once and reused by every scenario added later, which is why the connection layer has to be done properly the first time.
The assets that must be watched together sit on one map.
Alarms go to the right crew, and progress can be checked.
Raise, handoff and close stay on one event.
The wall screen and the duty desk read the same feed.
Not a feature list: what actually happens in a day. These four steps are the common shape of such projects.
A road keeps its lights on past sunrise; the circuit points to one transformer box.
A ticket goes to the lighting crew with the circuit and the last three faults.
Current returns, the ticket closes, and uptime enters the weekly report.
Every stage has a checkable output. No six-month build followed by a single review.
Walk the site, list devices, available ports and current systems, and mark what reads directly versus what needs a module.
Rank the ideas by impact, feasibility and dependencies, then choose one that proves value without dragging in every department.
Gateways connect devices, data lands on the platform, and alert rules, roles and recipients are configured for a small internal group.
One team or one building uses it for real; rules and screens change with feedback until false and missed alarms settle.
Check every acceptance item, finish documentation and training, then decide which buildings, lines or sites come next.
The three items below come from projects of this kind and go into the acceptance sheet, instead of relying on a general impression.
Duty staff are not switching among many systems
Alarms have an owner and a record
Reports and the floor share one feed
Duty and reports relied on last-minute sheets; configurable rotating boards replace screenshot-and-verbal numbers.
Key metrics on one screen
Learn More →CampusCampus assets and energy need a 3D map tied to the site; twin views map devices and alerts for duty and emergency.
Campus assets in one ops view
Learn More →Lights, covers, pumps and environment each have their own screen An alarm has no clear department to receive it Closed events leave no shared record Management figures and the duty desk figures differ
Asset board: The assets that must be watched together sit on one map. Alarm handoff: Alarms go to the right crew, and progress can be checked. Event history: Raise, handoff and close stay on one event. One data set: The wall screen and the duty desk read the same feed.
Duty staff are not switching among many systems Alarms have an owner and a record Reports and the floor share one feed
No. The platform reads through interfaces or gateways and the existing systems stay in use. Only modules nobody maintains are worth replacing.
Priced by scenarios and device connection points: a site survey produces the list, then a quote and schedule. Most projects have a first scenario live in four to eight weeks.
Leave one contact. We send how similar projects were handled plus a scenario list. If it is not worth doing, we say so.
Phones are answered 9:00-18:00 on weekdays, or scan the WeChat code.