Putaway state
Received, put away and pickable are separate states.
Inbound, stock, picking and equipment alarms in one warehouse flow.
This one stays inside the warehouse: putaway, stock accuracy, where picking slows, and which orders a stopped machine is holding.
Goods are on the floor while the system still says putaway pending
Count gaps have no receiving or picking cause
Slow picks are not tied to bin, route or machine
Machine alarms are not tied to the current order
Keep the equipment you have, connect the data first, then split the views by role. The connection layer takes the most work, and it is where most of our effort goes.
PLCs, meters, access control, cameras and sensors already on site. Read what is readable, add a module where it is not, and leave the existing control system alone.
Modbus · OPC UA · MQTT · HTTP · GB28181 · SDK
Common protocols connect directly. The gateway handles protocol mapping, local buffering and backfill, so the data does not break.
Device registry, time-series data, alert rules, work orders, roles and audit in one back end that serves several scenarios.
Data is collected once and reused by every scenario added later, which is why the connection layer has to be done properly the first time.
Received, put away and pickable are separate states.
A gap is tied to receiving or picking when the data allows.
A slow order shows a bin problem or a machine problem.
A stopped crane or conveyor lists the orders it holds.
Not a feature list: what actually happens in a day. These four steps are the common shape of such projects.
One rack is picked 40 times a day and the path clearly goes around it.
Fast movers move closer, and paths and task order change with them.
Distance per order drops, and the numbers inform the next slotting.
Every stage has a checkable output. No six-month build followed by a single review.
Walk the site, list devices, available ports and current systems, and mark what reads directly versus what needs a module.
Rank the ideas by impact, feasibility and dependencies, then choose one that proves value without dragging in every department.
Gateways connect devices, data lands on the platform, and alert rules, roles and recipients are configured for a small internal group.
One team or one building uses it for real; rules and screens change with feedback until false and missed alarms settle.
Check every acceptance item, finish documentation and training, then decide which buildings, lines or sites come next.
The three items below come from projects of this kind and go into the acceptance sheet, instead of relying on a general impression.
Pickable status is explicit
Count gaps trace to a step
A stop lists the orders it affects
Goods are on the floor while the system still says putaway pending Count gaps have no receiving or picking cause Slow picks are not tied to bin, route or machine Machine alarms are not tied to the current order
Putaway state: Received, put away and pickable are separate states. Why the count differs: A gap is tied to receiving or picking when the data allows. Where picking stalls: A slow order shows a bin problem or a machine problem. What the stop affects: A stopped crane or conveyor lists the orders it holds.
Pickable status is explicit Count gaps trace to a step A stop lists the orders it affects
No. The platform reads through interfaces or gateways and the existing systems stay in use. Only modules nobody maintains are worth replacing.
Priced by scenarios and device connection points: a site survey produces the list, then a quote and schedule. Most projects have a first scenario live in four to eight weeks.
Leave one contact. We send how similar projects were handled plus a scenario list. If it is not worth doing, we say so.
Phones are answered 9:00-18:00 on weekdays, or scan the WeChat code.