Park-Level Closed-Loop Energy Control

Beyond monitoring: a full loop of metering → analytics → strategy → actuation → review. HVAC, lighting and storage auto-adjust to load, with verifiable savings.

  • check_circle负荷预测 + 分时策略,空调照明自动调
  • check_circle光储充协同调度,峰谷套利与需量控制
  • check_circle节能效果 A/B 对比,月度复盘报告

verified Reply within 1 business day · 23 个已交付项目 · 支持私有化部署

Start with the problem, not the pitch

Leave your phone or WeChat and an engineer will reply within one business day.

No spam, and we never share your details with third parties.

Does any of this sound familiar?

If two or more of these apply, the gap is usually data integration, not another dashboard.

  • 01

    A monitoring platform exists but nobody acts on the data

  • 02

    HVAC and lighting run late or all night; guards switch lights off manually

  • 03

    Peak demand drives costly expansion although the load curve has clear shavable headroom

  • 04

    Vendors promise 20% savings but never show before/after data

What we actually build

Not off-the-shelf software — integration with your machines and process, plus dashboards and closed-loop actions.

  • settings_suggest

    负荷预测 + 分时策略,空调照明自动调

  • dns

    光储充协同调度,峰谷套利与需量控制

  • insights

    节能效果 A/B 对比,月度复盘报告

FAQ

How is control actually executed?expand_more

Strategies are pushed via BAS or smart breakers/contactors: scheduled start-stop, setpoints, astronomical lighting schedules. Every command and result is logged and auditable on the dashboard.

How do you prove the savings come from the system?expand_more

Baseline comparison: a weather/production-adjusted baseline is built before go-live and strategies are rolled out in groups (A/B), with monthly reports quantifying savings within confidence bounds.

Will control affect production or comfort?expand_more

Strategies run in advisory mode for 2–4 weeks before switching to automatic. Comfort constraints (temperature/humidity bands, illuminance floors) are hard limits with automatic fallback.

Can our existing monitoring platform be integrated?expand_more

Yes — the strategy engine reads metering data from your platform via API and drives BA/lighting systems, so existing investments are preserved. Parks without monitoring can have both built together.

Free assessment

Book a 30-min review

We start with your current situation and goals, then decide whether working together makes sense. Leave your contact and we will get back to you within one business day.

  • checkResponse within 1 business day, engineer to engineer
  • checkJudgement and budget range first, no hard sell
  • checkAssessment is free and your details stay private

No spam, and we never share your details with third parties.