Smart Park Energy Management System

Park-level energy management: unified electricity/water/gas/heat metering, subitem and per-tenant accounting, demand alerts and PV-storage-charging coordination. Self-hosted, data stays in your machine room.

  • check_circle电水气热一张图,分项分户自动核算
  • check_circle需量告警 + 需电申报建议,避免超额罚款
  • check_circle对接光储充与空调群控,能耗闭环

verified Reply within 1 business day · 23 个已交付项目 · 支持私有化部署

Start with the problem, not the pitch

Leave your phone or WeChat and an engineer will reply within one business day.

No spam, and we never share your details with third parties.

Does any of this sound familiar?

If two or more of these apply, the gap is usually data integration, not another dashboard.

  • 01

    Meters are read by hand; tenant cost allocation lives in spreadsheets and disputes never end

  • 02

    You know the total bill but not which building or system consumes it

  • 03

    Transformer demand keeps hugging the cap with occasional penalty-level overruns

  • 04

    Considering PV and storage but no load-profile data to justify it

What we actually build

Not off-the-shelf software — integration with your machines and process, plus dashboards and closed-loop actions.

  • settings_suggest

    电水气热一张图,分项分户自动核算

  • dns

    需量告警 + 需电申报建议,避免超额罚款

  • insights

    对接光储充与空调群控,能耗闭环

FAQ

We already have smart meters — can they be reused?expand_more

Yes. Mainstream meters and gateways (DL/T 645, Modbus, MQTT) are supported. Existing meters stay; only uncovered circuits get new smart meters or collectors.

Can complex cost-allocation rules be configured?expand_more

Subitem and per-tenant models are freely composable by floor, tenant and system, with shared-cost factors and TOU tariffs; monthly bills are generated automatically with drill-down data.

Where is data stored and who can view it?expand_more

Deploy in the park’s own machine room with data owned by the park. Property, owners and operators get role-based dashboards on web and mobile.

How to estimate payback?expand_more

From three measured items: eliminated demand penalties, reduced allocation losses and HVAC/lighting strategy savings. Most park projects pay back in 1.5–3 years; start with a 4–8 week pilot.

Free assessment

Book a 30-min review

We start with your current situation and goals, then decide whether working together makes sense. Leave your contact and we will get back to you within one business day.

  • checkResponse within 1 business day, engineer to engineer
  • checkJudgement and budget range first, no hard sell
  • checkAssessment is free and your details stay private

No spam, and we never share your details with third parties.